ANALISIS RISIKO KESELAMATAN DAN KESEHATAN KERJA MANUFAKTUR PADA PROSES PEMBUATAN SUKU CADANG MOBIL ARM VISOR SHAFT

Endah Asti Budianti, Reda Rizal

Abstract


PT. XYZ is a manufacture company of vehicle spare parts. One of the product is Arm Visor Shaft D01N. The process of making Arm Visor Shaft D01N can be exposed to be potential risk for workers. The source of potential risk is from the material, equipment, machine, environment and the other hazards. Therefore the risk management of occupational health and safety is very important to be implemented in the company. Hazard identification method using the Job Safety Analysis (JSA), while for risk analysis is undertaken by semi-quantitative method that uses risk assessment criteria (consequence, probability and exposure). Based on the research that the level of risk in the process of making Arm Visor Shaft are risk with very high level has 8, substantial level has 23, priority 2 level has 2 and acceptable level has 3.

Keywords


semi-quantitative risk analysis, risk, safety, health

References


Anonymous. 2004. Standards Australia/Standards New Zealand Handbook Risk Management Guideline Companion to AS/NZS 4360:2004. Sydney: Standard Australia International Ltd.

Anonymous. 1970. Undang-Undang No. 1 Tahun 1970 tentang Keselamatan Kerja

Anonymous. 1994. Peraturan Menteri Tenaga Kerja Nomor: 03/MEN/1994 tantang Penyelanggaraan Program Jaminan Sosial

Tenaga Kerja

Anonymous. 1993. Keputusan Menteri Tenaga Kerja R.I. No. Kep. 463/MEN/1993 tentang Pedoman Pemberian Penghargaan Keselamatan dan Kesehatan Kerja

Fine, William T. (1971). Mathematical Evaluation for Controlling Hazards. Naval Ordnance Laboratory White OAK : Maryland.

Ramli, S. 2010. Pedoman Praktis Manajemen Risiko dalam Perspektif K3 OHS Risk Management. Jakarta: Dian Rakyat.

Ramli, S. 2010. Sistem Manajemen Keselamatan & Kesehatan Kerja OHSAS 18001. Jakarta:Dian Rakyat.

Santoso, Haryo, Rani Rumita dan Hutami Nuke Ardani. 2014. Kajian Risiko Kesehatan dan Keselamatan Kerja pada Mill Boiler di Pabrik Gula Pakis Baru Jati. 1st Annual Conference in Industrial and System Engineering, diakses 22 April 2015. http://eprints.undip.ac.id/44484/1/Haryo_Santoso_PROCEEDING_ACISE_2014_F

INAL.pdf

Anonymous. 2015. Profil Perusahaan PT. XYZ,

diakses 5 Juni 2015.

http://www.tosamaabadi.com


Article Metrics

Abstract view : 292 times
PDF (Bahasa Indonesia) - 1245 times

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Creative Commons License


This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

Fakultas Teknik UPN "Veteran" Jakarta