PEMILIHAN SUBKONTRAKTOR PT X DENGAN METODE ANALYTICAL HIERARCHY PROCESS

Authors

  • Lilik Zulaihah Rio Patria Fakultas Teknik Universitas Pembangunan Nasional “Veteran” Jakarta Jl. RS Fatmawati – Pondok Labu Jakarta Selatan 12450, Indonesia
  • Rio Patria Fakultas Teknik Universitas Pembangunan Nasional “Veteran” Jakarta Jl. RS Fatmawati – Pondok Labu Jakarta Selatan 12450, Indonesia

DOI:

https://doi.org/10.54378/bt.v12i1.95

Keywords:

AHP, Analytical Hierarchy Process, Subcontractor

Abstract

PT. X is a company engaged in the field of engineering services procurement and construction (EPC), whose scope of work is the provision which has activities such as selecting subcontractors and evaluate the performance of subcontractors and building maintaining relationship with subcontractors. The selection of subcontractors has been less effective, because the show just based on the lowest offer and mere instinct of managers. So that when the project goes arises the problem stems from a subcontractor who is not taken into account before. This research helps decision maker in making the decision to choose a subcontractor in the project Based Oil Flushing (BOF) by integrating Analytical Hierarchy Process (AHP) method. AHP is used to determine the weight of the priority with seven aspect of the three first priorities of quality aspects, financial aspects, and aspects of the company’s reputation, and is also used to determine the weight AHP priorities of the twenty-three criteria with three first priority the offer price, quality assurance, and work experience. Of the four subcontractors research result into the most optimal subcontractor, chosen in accordance with the value of the achievement of targets is limited to the smallest deviation from other subcontractors.

References

ANDI dan MADCOMS, 2007. Microsoft EXCEL 2007, Membangun Rumus dan

Fungsi. 1st penyunt. Madiun: ANDI OFFSET.

Anggraeni, W., 2009. Pengukuran Kinerja Pengelolaan Rantai Pasokan Pada PT. Crown Closures Indonesia.

BPMIGAS, 2011. Pedoman Pengelolaan Rantai Suplai Kontraktor Kerja Sama . Dalam: Pedoman Tata Kerja Nomor 007 REVISIII/ PTK/I/2011. 2nd penyunt. Jakarta: BPMIGAS.

Messah, A. Y., Pono, D. R. R. & Krisnayanti, S. D., 2009. Dinamika TEKNIK SIPIL. Kajian Kriteria Pemilihan Subkontraktor Oleh Kontraktor Utama Menggunakan Metode Analytical Hierachy Process (AHP), p. 94.

Padmowati, R. d. L. E., 2009. Pengukuran Index Konsistensi Dalam Proses Pengambilan Keputusan Menggunakan Metode AHP. Seminar Nasional Informatika UPN "veteran" Yogyakarta, p. 80.

Sedzro, K., Marouane, A. & Assogbavi, T., 2012. Journal of Mathematic Finance. Analitycal Hierarchy Process and Goal Programming Approach for Asset Allocation, Volume II, pp. 96-104.

Siswanto, 2007. Operations Research. 1st penyunt. Bogor: Erlangga.

Suryabrata, S., 2011. Metodologi Penelitian.1st penyunt. Jakarta: PT. Raja Grafindo Persada.

Taha, H. A., 2007. Operations Research: An Introduction. 8th penyunt. New Jersey:Upper Saddle River.

Taylor III, B. W., 2013. Introduction to Management Science. 11th penyunt.London: Pearson.

Published

2017-08-02