PENERAPAN PROSEDUR OPERASIONAL FLOATING DOCK 6000 TLC

Authors

  • Bambang Sudjasta Program Studi Teknik Perkapalan-FakultasTeknik, UPN ”Veteran” Jakarta, Jakarta Selatan

DOI:

https://doi.org/10.54378/bt.v12i1.91

Keywords:

stability, prosedur, TLC

Abstract

Floating dock is one of the places for the repair of ship. It is a building that float on the sea, and has the ability to raise the vessel with longitudinal or transverse slope sizeable. It is needed a stable balance during the docking operation. In the implementation of docking the vessel must pay attention to the security elements of material and personnel. Should be avoided for slope occurring and ensuring the security and safety of the ship docking process. The implementation should always follow established procedures. the implementation should always follow established procedures.

References

Amirikian, Arsham, 1997. “Analysis and Design of Floating Dry docks”, The Society of Naval Architects and Marine Engineers, New York.

Anugraha, Alex, 1987. “Perencanaan Dok Apung 5000 TLC Jenis Ponton”, Tugas Akhir, Jurusan Teknik Perkapalan, Fakultas Teknologi Kelautan ITS, Surabaya.

BKI, 2006.“Rules for The Classification and Construction of Sea Going Steel Ships, VolumeII, Rules for Hull Construction, Jakarta.

BKI, 2006.“Rules for The Classification and Construction of Sea Going Steel Ships, Volume III, Rules for Machinery Instalation”, Jakarta.

Cornick, Henry F., 1998. “Dock and Harbour Engineering”, Volume 1 The Design of Docks, Second Edition, Charles Griffin and Company Limited, London.

Harrington, Roy L., 1992. “Marine Engineering”, The Society of Naval Architecs and Marine Engineers, 601 Pavonia Aveneu, Jersey City.

Khetagurov, M., 1954. “Marine Auxiliary Machinery and Systems”, Peace Publishers, Moscow.

Lloyd’s Register of Shipping, 1973. “Floating Docks, Rules and Regulation for the Construction and Classification of Floating Docks”, Volume II, 71 Fenchurch Street, London.

Published

2017-08-02