This research was conducted at PT XYZ, a tire manufacturing company established in 1988 in Indonesia. The study focuses on the curing tire press machine, which has experienced high downtime issues. The purpose of this research is to analyze Total Productive Maintenance (TPM) using the Overall Equipment Effectiveness (OEE) method and calculate the Six Big Losses on the machine during the period of January to June 2023. Data was collected through observation, interviews, and literature review. The findings show that high breakdown frequency significantly impacted downtime and reduced production effectiveness. The OEE value of the curing tire press machine was 78.22%, which is below the global OEE standard of 85%. The largest factor hindering OEE achievement was Idling and Minor Stoppages, with a value of 21%. The proposed recommendations are expected to reduce downtime and improve machine performance, allowing PT XYZ to meet its production targets.

References

A. Cherrafi, A., Elfezazi, S., Garza-Reyes, J. A., Benhida, K., & Mokhlis, “‘Barriers in Green Lean implementation: A combined systematic literature review and interpretive structural modelling approach.,’” Prod. Plan. Control, vol. 31, no. 7, 2020.

A. Nurjaman and D. Haryadi, “Penjadwalan Produksi Dan Tata Letak Terhadap Kelancaran Proses Produksi,” J. Sosiohumanitas, vol. 20, pp. 14–31, 2018.

A. W. E. R. Supriatna, I. A. Marie, “Autonomous Maintenance Pada Plant Ii Pt. Ingress Malindo Ventures,” ,” J. Tek. Ind., vol. 5, pp. 29–41, 2017.

M. B. Anthony, “Analisis Penerapan Total Productive Maintenance (TPM) Menggunakan Overall Equipment Efectiveness (OEE) Dan Six Big Losses Pada Mesin Cold Leveller PT. KPS,” JATI UNIK,” J. Ilm. Tek. dan Manaj. Ind, vol. 2, p. 94, 2019.

H. Jain, A., Bhatti, R., & Singh, “Implementation of total productive maintenance in manufacturing industries: A literature review,” Int. J. Qual. Reliab. Manag., vol. 39, no. 1, pp. 130–170, 2022.

T. T. Nurmala Hamzah and A. Momon, “Analisis Total Productive Maintenance (TPM) Menggunakan Metode Overall Equipment Effectiveness (OEE) Pada Mesin Injection 2500T New di PT. XYZ,” J. Serambi Eng., vol. 8, no. 1, 2023, doi: 10.32672/jse.v8i1.4996.

Y. Sharma, R., Jaggar, D., & Agarwal, “). Total Productive Maintenance Implementation in Manufacturing Industries: A Comprehensive Review and Future Research Directions.,” Int. J. Product. Perform. Manag., vol. 72, no. 2, 2023.

A. R. Sinha, M. K., Verma, A. K., & Singh, “A framework for implementation of total productive maintenance in foundry industry: An ISM approach.,” Int. J. Syst. Assur. Eng. Manag., vol. 12, no. 3, pp. 533–545, 2021.

G. Nallusamy, S., & Majumdar, “Enhancement of Overall Equipment Effectiveness by Implementation of Total Productive Maintenance in Manufacturing Industries.,” Int. J. Mech. Prod. Eng. Res. Dev., vol. 13, no. 2, pp. 171–182, 2023.

A. Wahid, “Penerapan Total Productive Maintenance (TPM) Produksi Dengan Metode Overall Equipment Effectiveness (OEE) Pada Proses Produksi Botol (PT. XY Pandaan – Pasuruan),” J. Teknol. Dan Manaj. Ind., vol. 6, no. 1, pp. 12–16, 2020, doi: 10.36040/jtmi.v6i1.2624.

S. Sahoo, S., & Yadav, “Total quality management in Indian manufacturing SMEs.,” Procedia Manuf., vol. 51, pp. 555–560, 2021.

T. M. S. Mohamed Y. Ali, “Evaluation of Six Big Losses in TPM Using OEE for an Automotive Industry,” Int. J. Prod. Res., vol. 58, no. 18, 2020.

L. J. John Smith, “Reducing Setup Time in TPM Implementation: A Case Study,” J. Manuf. Technol. Manag., vol. 31, no. 7, 2020.

S. G. Alan Brown, “Minimizing Minor Stops in a Lean Manufacturing Environment,” Int. J. Lean Six Sigma, vol. 12, no. 2, 2020.

J. B. Maria White, “Analyzing Speed Losses in Manufacturing Systems,” J. Manuf. Process., vol. 50, no. 3, 2020.

M. C. Hannah Lewis, “Reducing Process Defects through TPM and Quality Management,” Int. J. Qual. Reliab. Manag., vol. 37, no. 8, 2020.

R. M. Laura Johnson, “Analyzing Speed Losses in Manufacturing Systems,” J. Manuf. Process., vol. 142, no. 9, 2020.

A. O. otomkin, M. M., Sedliar, A. A., Deineha, O. V., & Zvarych, “Comprehensive Use of the Pareto Principle and the Analytic Hierarchy Process to Increase the Substantiation of Alternative Ranking Results,” Cybern. Syst. Anal., vol. 57, no. 3, 2021.

N. Jefferson-Lenskyj, “A Practical Guide to Creating a Pareto Chart as a Quality Improvement Tool,” Glob. J. Qual. Saf. Healthc., vol. 1, no. 2, 2020.

A. Grajewski, D., Gola, A., & Karwasz, “Hybrid approach for fault detection and identification in manufacturing systems.,” Procedia CIRP, vol. 88, pp. 141–146, 2020.

Published

2025-08-29

How to Cite

Siti Rahayu. (2025). Analisis Total Productive Maintenance Menggunakan Metode Overall Equipment Effectivenes (OEE) dan Six Big Losses Pada Mesin Curing Tire Press di PT.XYZ. Journal of Optimization System and Ergonomy Implementation, 3(01). Retrieved from https://ejournal.upnvj.ac.id/joseon/article/view/10506